| Remote Cutting Tool and Delivery System |
|
|
|
Customer: Atomic Energy of Canada Limited (AECL)
Project: Bruce Units 1 & 2 Retube Location: Bruce Power's Bruce Nuclear Generating Station, Ontario, Canada Services: Engineering, design, procurement, fabrication, assembly, testing Scope of work:Prototype development and testing
System Function and Features: The "retubing" operation of CANDU refurbishment requires the cutting and removal of reactor Calandria End-Fittings and Pressure Tubes. Highly irradiated fuel channel components must be removed and replaced. This remote operated Cutting Tool is positioned on the reactor face aboard a ODIM Numet supplied Work Table. The tool Delivery System locks onto a pressure tube end-fitting and aligns the cutting head in 3 axes to a precision of 0.05 inches using a camera/system. A custom cutting head is rotated around the end-fitting cutting at 400 RPM. 480 channels must be completed per reactor face with an actual cutting time of about 60 minutes each.Remote Cutting Tool and Delivery System |